For subscribers
Reforming the WSU
Investment Programme of Tver Vodokanal:
 

The investment programme for the development of water-supply and wastewater-disposal systems in 2007-2012 has been passed by the expert panel of Town Hall, specialist committee of the Tver Town Duma, and a resolution of the Town Duma enacted it at the session of 30 October 2007.

  The programme provides for:

  • construction of an additional water purification station with a capacity of 100 thou. cubic metres per day with a water reservoir of 10 thou. cubic metres;
  • construction of a reservoir at the Mednovka water-intake;
  • drilling of new wells;
  • refurbishment of existing, and engineering of new, mains networks for water supply and sewerage, pumping stations;
  • construction of facilities for advanced post-treatment of wastewater at sewage disposal plants with refurbishment of treatment facilities;
  • construction of water-supply control stations in Korolyov Street, Komintern Street, for the Krasnaya Sloboda estate;
  • construction of local systems of water-supply and sewerage for the southern part of the population centre Posyolok Imeni Krupskoy, Cherkassy estate, in the village of Staraya Konstantinovka, the village of Krasnoye Znamya.

Printable version

The contact information

2, build. 4 Gamsonovskiy pereulok, Moscow, 115191, Russia
E-mail: info@rosvodokanal.ru
Phone:+7 (495) 514-02-11
Fax:+7 (495) 514-11-17